KAJIAN POTENSI TERJADINYA TUNTUTAN KONTRAKTOR PELAKSANA TERHADAP PENGGUNA JASA (OWNER) PADA PROYEK

Zakia Zakia

Abstract


In the world of construction, pengendaliaan time, cost and quality are very important for achieving the ultimate goal of the project. Demands are filed compensation requests of the executor of the service providers. Charges could result in failure to achieve the ultimate goal of a project that has been planned in advance. Besides the losses incurred can affect the work or product. Those who feel aggrieved can file charges to include any losses experienced and an explanation of the rights that have been violated. The problem is to know which factors are most likely to cause the occurrence of claims from the contractor of the project owner (owner). The purpose of this research is to mengindentifikas factors that potentially cause the demands of service providers (contractors Executor) to service users. Based on data analysis, it is found 17 items of questions from 32 questions otherwise valid Corrected Item Total Correlation values> 0.3, while the other 15 question items is invalid because the value of Corrected Item Total Correlation <0.3. Analysis of reliability can be seen that the value cronbach'alpha if item deleted> 0.60, meaning that 32 respondents in the 32 item questionnaire that question is accurate, stable and consistent. Factors differences in field conditions is a factor that causes the highest demands.

Keywords: potential, the demands of the contractor.


Full Text:

PDF

References


Ahuja, H. N., 1983,Project management, A willey – interscience publication. John Willey & Son. Inc

Barrie., Donald S. B. C., Paulson Jr., dan Sudinarto, 1990, Manajemen Konstruksi Profesional, Edisi ke-2, Jakarta, Erlangga.

Bonenehu, F. 2008. Analisis Klausa Kontrak, Viewed 02 Febuari 2016 Pukul 15.00WIB Avaliable From Internet

Edward, R., dan Fisk, P.E, 1997, Construction Project Administration, Fifth Edition, Prentice Hall, New Jersey.

Federation International Des Ingenieurs Councels (FIDIC). 4 Edition., 1987, USA

Gilbreath, R. D,. 1995,Managing Construction Contract, Edisi ke-2, John Willey & Son .Inc.

Herry, P,. 2005, Studi Pengajuan Klaim Konstruksi Dari Kontaktor Ke Pemilik Banggunan, Universitas Kristen Petra,Dimensi Teknik Sipil Vol 7.

Logawa., dan Gunawan, 2007,Manajemen Poryek Konstruksi, Jakarta, Universitas Trisakti.

Prayogo, D., 2012, Melakukan Kajian Potensi Terjadinya Tuntutan Pada Proyek Pembangunan Gedung Hotel Santika Medan,Tugas Akhir, Fakultas Teknik Sipil, Universitas

Sumatra Utara.

Saleh.,dan Nursyam, 2007,Faktor-Faktor Yang Menyebabkan Dan Penyelesaiannya Pada Industri Konstruksi, Diakses 20 September Pukul 21.00 WIB, Http :

//Www.Fab.Utm.My/Download/Cobference Seminar/ICCI

Sianipar, H.B., 2012, Analisis Faktor–Faktor Penyebab Keterlambatan Penyelesaian Proyek Konstruksi Dan Pengaruhnya Terhadap Biaya. Penerbit Fakultas Teknik Universitas Sebelas Maret Surakarta.

Suyatno, 2010, Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung. Penerbit Fakultas Teknik Universitas Diponegoro Semarang.

Soeharto.,dan Imam, 1995, Manajemen proyek Dari Konseptual Sampai Operasional,Edisi Ke-1, Jakarta, Erlangga.

Zulfan, J., 2009,Kajian Potensi Terjadinya Tuntutan penyedia Jasa Pada Proyek Konstruksi (Studi Kasus : Pembangunan Gedung Rumah Sakit Pendidikan Universitas Padjajaran), Tugas Akhir, Fakultas Teknik Sipil, Institut Teknologi Bandung.




DOI: https://doi.org/10.35308/jts-utu.v2i2.418

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 Jurnal Teknik Sipil