STUDI KELAYAKAN INVESTASI DAN OPTIMALISASI KEUNTUNGAN DEVELOPER DENGAN PROPORSIONAL JUMLAH TIPE RUMAH

Astiah Amir, Dorra Sikhhy

Abstract


Research on Development Projects Griya Mahony aims to determine the feasibility of the investment project in this case the benefits will be achieved. The feasibility study is based on the financial aspects
of using parameter Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR) is calculated based on the length of the installment/credit generate favorable value/ feasible (feasible). For a 10-year installment (NPV Rp.802.618.444, BCR 1.036 and 2.469% IRR), for repayment periods of 15 years (NPV Rp4.208.880.167, BCR and IRR 1,174 5,368%), for repayment
periods of 20 years ( NPV is Rp7.432.022.615, BCR and IRR 1,285 6.555%), and for the repayment periods of 25 years (NPV Rp10.886.611.347, BCR and IRR 1,388 7.272%). So the value obtained in this project future installments of not less than 10 years and not more than 25-year repayment periods. Having carried out a sensitivity analysis for future installments credit 10 years of investment is not feasible (unfeasible), while for future installments / credit 15 years, a period installment/loan repayment periods of 20 years and credit / 25 years of investment in this project is still feasible. This study was followed by memproporsionalkan number of house types to be produced to obtain the optimal proportion of the number of houses. From these results, the optimal amount that must be built on to three (3) types of housing totaling 76 units, with 80 types of houses as many as 13 units, 65 type of house 29 units, and 45 types of housing as many as 34 units. Gains derived from the proportion of the number of house types are optimal for repayment periods of 10 years of Rp7.162.031.000, for 15year repayment
periods Rp11.08509 billion, to 20-year repayment periods of
Rp15.380.030.000 and to 2-year installment period Rp 19.95799 billion. From the calculation of investment feasibility studies for optimal conditions of house number greater than the condition of houses planned by the developer.

Full Text:

PDF

References


Anonim, 2010, Modul Studi Kelayakan Bisnis, Universitas Padjajaran. [2]Giatman, M, 2006, Ekonom Teknik, Jakarta: PT. Rajagrafindo Persada.

Fredrik, Steven dan J. Tjakra, 2013, Analisis Biaya Investasi pada Perumahan Griya Paniki Inda Jurnal, Jakarta: Universitas Sam Ratulangi.

Kistiani, Frida, 2010, Optimasi Pendanaan Proyek dengan Teknik Pemograman Linier, Tesis, Semarang: Universitas Diponegoro.

Purba, Wenny, 2011, Optimasi Perencanaan Produksi Dengan Metode Goal Programming, Skripsi, Medan: Universitas Sumatera Utara.

Sudarsana, D.K 2009, Optimalisasi Jumlah Tipe Rumah yang Akan Dibangun Dengan Metode Simpleks, Jurnal, Denpasar: Universitas Udayana.

Wanaagung, H 2011, Evaluasi Pembangunan Perumahan Grand Renon Prime Residence, Tesis, Denpasar: Uni versitas Udayana.