Penjadwalan Produksi Paving Block Pada CV. Nibo Corporation Banda Aceh
Abstract
This paper uses the Palmer method to schedule paving block production in CV. Nibo Corporation Banda Aceh. CV. Nibo Corporation is engaged in the production of paving blocks located in the city of Banda Aceh. Problems faced by CV. Nibo Corporation often produces excess paving blocks than the number of orders that results in product accumulation in the storage area. The purpose of this study is to schedule paving block production in CV. Nibo Corporation. Paving block production scheduling in CV. Nibo Corporation will use the Palmer method. This research begins by calculating each standard time for each job. From the scheduling results, the comparison between the initial factory work schedule is nine hours of work in one day, and twenty-four working days in a month. While scheduling using the palmer method is six hours of work in one day and twenty-four working days in a month, or nine hours of work in one work day and seventeen days in a month. Using the palmer method can reduce the difference in production and orders every month from 31.000 to 5.944, or 3.000 per month, thereby reducing the accumulation of paving block products.
Keywords
Full Text:
PDFReferences
Ginting, R, 2009, Penjadwalan Mesin, Edisi Pertama, Graha Ilmu, Yogyakarta.
Nadia, V., Dewi, D. R. S., & Sianto, M. E., 2017, Penjadwalan Produksi dan Perancangan Persediaan Bahan Baku di PT. Wahana Lentera Raya, Widya Teknik, vol 9, no 2, hal 179-192.
Nurhasanah, N., Haidar, F. Z., Hidayat, S., Listianingsih, A., Agustini, D. U., & Hasanati, N. U., 2014, Penjadwalan Produksi Industri Garmen dengan Simulasi Flexsim. Jurnal Ilmiah Teknik Industri, vol 2, no 3, hal 141-148.
Nova, M. K. M. H., & Ilhami, M. A., 2017, Usulan Penjadwalan Produksi Dengan Metode Campbell Dudek Smith, Heuristic Pour dan Palmer Untuk Meminimasi Makespan Di PT. Krakatau Wajatama, Jurnal Teknik Industri Untirta, vol 5, no 1, hal 46-51.
Mail, A., Nusran, M., Chairany, N., Nur, T., & Faturrahman, R., 2018, Analisis Penjadwalan Produksi dengan E-issn 2503-1430 Issn 2541-3090 Menggunakan Metode Campbell Dudeck Smith Dan Palmer Pada PT. Bobi Agung Indonesia, Journal of Industrial Engineering Management, vol 3, no 2, hal 41-47.
DOI: https://doi.org/10.35308/jopt.v6i1.2063
Refbacks
- There are currently no refbacks.
Copyright (c) 2020 Jurnal Optimalisasi
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
JOPT: Jurnal Optimalisasi Indexing and Abstracting by: