EFEKTIVITAS PERAWATAN UNIT BOILER: STUDI KASUS DI PT. BEURATA SUBUR PERSADA

Maidi Saputra, Redha Kurniawan, Al Munawir

Abstract


A boiler is a tool used to produce steam that is used for various purposes in palm oil mills. In a boiler system, the readiness and conditioning of the equipment are considered to meet the planned production targets. Maintenance, in particular on a boiler unit, is something that must be considered and essential to implement. This study aims to get an overview of the maintenance of the boiler unit at PT. Beurata Subur Persada. This research uses several methods in getting the desired results, including descriptive data collection/field interviews, from the observation and interview process with PT. Beurata Subur Persada, the planning of the maintenance process by factory conditions, is planned maintenance.

 

Keywords: Boiler, Palm oil mills, Maintenance, Planned maintenance, PT. Beurata Subur Persada

 


Full Text:

PDF

References


“Beurata Subur Persada - Nagan Raya Palm Oil Mill.” [Online]. Available: https://www.industryabout.com/country-territories-3/1937-indonesia/vegetable-oil-industry/30118-beurata-subur-persada-nagan-raya-palm-oil-mill. [Accessed: 20-Jun-2020].

E. Y. Setyawan and E. P. Tarigan, “Analisa Perawatan Ketel Uap Takuma N-600SA Menggunakan Metode FMEA , ANOVA dan RBD di PT . Perkebunan Nusantara III,” Energy, vol. 8, no. 2, pp. 8–14, 2018.

S. A. Muin, “Pesawat-pesawat konversi energi I : ketel uap / Syamsir A. Muin,” 1988.

“Rekomendasi Manajemen perawatan industri.by.Fajar Kurniawan. terbaru & terlengkap | Tokopedia.” [Online]. Available: https://www.tokopedia.com/rekomendasi/692826981?ref=googleshopping&c=8258912057&m=127998088&p=692826981&gclid=EAIaIQobChMI1OK5n46T6gIV2DUrCh1AuA-8EAYYASABEgIPK_D_BwE&gclsrc=aw.ds. [Accessed: 21-Jun-2020].

中牟田誠 and 国府島庸之, “Jurnal Kajian Manajemen Bisnis,” vol. 109, no. 4, pp. 555–562, 2012, doi: 10.2403/jkmb.10885100.

“CLICK HERE FOR DOWNLOAD Description: For courses in Operations Management.”

I. P. S. Ahuja and P. Kumar, “A case study of total productive maintenance implementation at precision tube mills,” J. Qual. Maint. Eng., vol. 15, no. 3, pp. 241–258, Aug. 2009, doi: 10.1108/13552510910983198.

H. Rachman, A. K. Garside, and H. M. Kholik, “Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM),” J. Tek. Ind., vol. 18, no. 1, p. 86, 2017, doi: 10.22219/jtiumm.vol18.no1.86-93.

B. Dhillon, “Maintainability, Maintenance, and Reliability for Engineers,” Maint. Maintenance, Reliab. Eng., pp. 1–8.

P. Preventive, M. Mesin, N. Fadilah, D. F. Aksioma, F. Matematika, and S. Data, “Optimasi Penentuan Waktu Optimum Menggunakan Metode Geometric,” vol. 7, no. 2, pp. 40–45, 2018.

“SISTEM PEWRAWATAN TERPADU (INTEGRATED MAINTENANCE SYSTEM) - PDF Download Gratis.” [Online]. Available: https://docplayer.info/30433847-Sistem-pewrawatan-terpadu-integrated-maintenance-system.html. [Accessed: 22-Jun-2020].




DOI: https://doi.org/10.35308/jmkn.v6i1.2311

Refbacks

  • There are currently no refbacks.